Inzynieria
Member since 11 months
6 ads
Robel Tamper 62.05
578 170 SDG
Tokār, Soudan
- Published at: 23/01/2024 13:58
- Category: Construction - Worksite - Big work - Tools
Description ad
The device is ideal for obtaining long-term track geometry in less than 2 minutes / sleeper. Provides optimal track opening parameters. Correction of track geometry errors that lasts for a long time and ensures trouble-free operation. - Sets ballast in motion - Low hand-arm vibration - High tamping capacity - Long life and higher carrying capacity of track bed - Design noticeably relieves the operator - Significantly reduced emissions - Replaceable tamping tool of low-wear steel - Reduced mainte...
See more
Inzynieria ads